DocumentCode :
3001400
Title :
Minimizing the total weighted completion time on unrelated parallel machines with stochastic times
Author :
Arnaout, Jean-Paul M. ; Rabadi, Ghaith
Author_Institution :
Dept. of Eng. Manage. & Syst. Eng., Old Dominion Univ., Norfolk, VA, USA
fYear :
2005
fDate :
4-7 Dec. 2005
Abstract :
This paper addresses the problem of batch scheduling in an unrelated parallel machine environment with sequence dependent setup times and an objective of minimizing the weighted mean completion time. Identical jobs are batched together and are available at time zero. Processing time of each job of a batch is determined according to both the machine it is assigned to and the batch group to which the job belongs. The jobs´ processing times and setup times are stochastic for better depiction of the real world. This is a NP-hard problem and in this paper, a solution heuristic is developed and compared to existing ones using simulation. The results and analysis obtained from the computational experiments proved the superiority of the proposed algorithm PMWP over the other algorithms presented.
Keywords :
batch processing (industrial); computational complexity; minimisation; parallel machines; scheduling; stochastic processes; NP-hard problem; batch scheduling; stochastic times; total weighted completion time minimization; unrelated parallel machines; Algorithm design and analysis; Availability; Computational modeling; Concurrent computing; Discrete event simulation; NP-hard problem; Parallel machines; Processor scheduling; Scheduling algorithm; Stochastic processes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2005 Proceedings of the Winter
Print_ISBN :
0-7803-9519-0
Type :
conf
DOI :
10.1109/WSC.2005.1574499
Filename :
1574499
Link To Document :
بازگشت