Abstract :
The power transfer restrictions on the transmission lines 150 kV in Sumatera Interconnection System caused electric power generated by the power plant with lower cost in fuel at Southern Sumatera cannot be optimally delivered to the load centers in Northern Sumatra. One of technical solution that is expected to solve this problem is fixed series capacitor installation in tie line Lubuk Linggau - Bangko. It is connecting Southern Sumatera and Northern Sumatera through Central Sumatera. Simulation carried out with Digsilent 12.0. Simulation results indicate a maximum transfer can be improved, however system stability is become lower but still at safe limits.
Keywords :
power capacitors; power plants; power system interconnection; power system stability; power transmission lines; Digsilent 12.0; Northern Sumatra; Southern Sumatera; Sumatera interconnection system; electric power generation; fixed series capacitor installation; load centers; power plant; power transfer restrictions; system stability; tie line Lubuk Linggau-Bangko; transmission lines; voltage 150 kV; Capacitors; Circuit stability; Mathematical model; Power generation; Power system stability; Power transmission lines; fix series capacitor; maximum power transfer; tie line; transmission 150 kV;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Condition Monitoring and Diagnosis (CMD), 2012 International Conference on
Conference_Location :
Bali
Print_ISBN :
978-1-4673-1019-2
Type :
conf
DOI :
10.1109/CMD.2012.6416206
Filename :
6416206
Link To Document :
بازگشت