• DocumentCode
    301559
  • Title

    An iterative method for scheduling a FMS

  • Author

    Chu, Chengbin ; Tournier-Colletta, Jean-Luc

  • Author_Institution
    Inst. Nat. de Recherche en Inf. et Autom., Lorraine, France
  • Volume
    3
  • fYear
    1995
  • fDate
    22-25 Oct 1995
  • Firstpage
    2137
  • Abstract
    Develops an approach to solve a scheduling problem in a flexible manufacturing system (FMS). This is a highly automated system composed of several identical machining centers. Due to the large variety of parts manufactured in the system, tool magazines of the machining centers cannot hold at the same time all the tools necessary. Therefore, a robot is used to load tools into a magazine or unload tools from it. Parts are handled by an AGV between the input station, output station and the machining centers. Therefore, three types of resources have to be coordinated in order to maximize the throughput or to minimize the makespan in terms of scheduling theory
  • Keywords
    automatic guided vehicles; flexible manufacturing systems; industrial robots; iterative methods; machine tools; machining; materials handling; production control; resource allocation; robots; AGV; FMS; flexible manufacturing system; iterative method; machining centers; makespan minimisation; resources coordination; scheduling; tool magazines; Flexible manufacturing systems; Iterative methods; Job shop scheduling; Machining; Manufacturing systems; Milling machines; Robot kinematics; Robotics and automation; Security; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man and Cybernetics, 1995. Intelligent Systems for the 21st Century., IEEE International Conference on
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-2559-1
  • Type

    conf

  • DOI
    10.1109/ICSMC.1995.538096
  • Filename
    538096