Analysis of different fuzzy CPM network planning procedures
Author
Kanmohammad, S. ; Rahimi, F. ; Sharifian, Mohammad B. B.
Author_Institution
Dept. of Electr. Eng., Tabriz Univ., Iran
Volume
3
fYear
2003
fDate
14-17 Dec. 2003
Firstpage
1074
Abstract
With great progress in fuzzy set theory there have been also several efforts in using this theory in network planning methods such as PERT and CPM to make more realistic usage of them and better dealing with uncertainties that is intrinsic in estimating duration of activities. In this paper, using noninteractive fuzzy subtraction, we have proposed an algorithm that reads fuzzy numbers as activity durations along with their initial and final node numbers; constructs network and computes earliest expected time, latest allowable time, and slack time for each node. At the end, critical path, or paths for different a-cuts are calculated. Instead of classical descriptive methods, we have used numeric methods and whenever the shape of the fuzzy number differs from initial shape (e.g. triangular), using defuzzification with center of gravity and refuzzification; we convert the number to its initial shape.
Keywords
critical path analysis; fuzzy set theory; warehousing; activity durations; bell-shaped estimation; defuzzification; final node numbers; fuzzy CPM network planning; fuzzy critical path; fuzzy numbers; fuzzy set theory; initial node numbers; membership functions; noninteractive fuzzy subtraction; triangular estimation; warehousing mechanization; Dynamic programming; Fuzzy control; Fuzzy set theory; Fuzzy systems; Graph theory; Gravity; Large-scale systems; Project management; Shape; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Electronics, Circuits and Systems, 2003. ICECS 2003. Proceedings of the 2003 10th IEEE International Conference on
Print_ISBN
0-7803-8163-7
Type
conf
DOI
10.1109/ICECS.2003.1301696
Filename
1301696
Link To Document