• DocumentCode
    3026887
  • Title

    Management Essentials for Urgent Repair of Highway after Disaster -- Taking a Tunnel of a Highway as an Example

  • Author

    Jin Hu ; Xuegang Feng ; Jian Wu ; Jianhua Jiang

  • Author_Institution
    Dept. of civil Eng., Tsinghua Univ., Beijing, China
  • fYear
    2013
  • fDate
    29-30 June 2013
  • Firstpage
    752
  • Lastpage
    755
  • Abstract
    In recent years, various disasters have taken place frequently, and then highway blocking has happened from time to time. In order to be open to traffic as soon as possible, the project management should take the corresponding measures not consistent with the normal construction. This paper mainly studied the project management of urgent repair of highway after disaster(This paper uses "this kind of project"), analyzed the characteristics of urgent repair of highway after disaster, main tasks of project management, and proposed the measures to improve the ability and level of project management of this kind of project based on the actual situations and project management experience, so as to perfect the this kind of project and create greater benefits for people.
  • Keywords
    construction; emergency management; maintenance engineering; project management; disaster; highway; management essentials; project management; tunnel; urgent repair; Companies; Earthquakes; Maintenance engineering; Personnel; Project management; Road transportation; Safety; After Disaster; Highway; Project Management; Urgent Repair;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Digital Manufacturing and Automation (ICDMA), 2013 Fourth International Conference on
  • Conference_Location
    Qingdao
  • Type

    conf

  • DOI
    10.1109/ICDMA.2013.179
  • Filename
    6598100