DocumentCode
3026887
Title
Management Essentials for Urgent Repair of Highway after Disaster -- Taking a Tunnel of a Highway as an Example
Author
Jin Hu ; Xuegang Feng ; Jian Wu ; Jianhua Jiang
Author_Institution
Dept. of civil Eng., Tsinghua Univ., Beijing, China
fYear
2013
fDate
29-30 June 2013
Firstpage
752
Lastpage
755
Abstract
In recent years, various disasters have taken place frequently, and then highway blocking has happened from time to time. In order to be open to traffic as soon as possible, the project management should take the corresponding measures not consistent with the normal construction. This paper mainly studied the project management of urgent repair of highway after disaster(This paper uses "this kind of project"), analyzed the characteristics of urgent repair of highway after disaster, main tasks of project management, and proposed the measures to improve the ability and level of project management of this kind of project based on the actual situations and project management experience, so as to perfect the this kind of project and create greater benefits for people.
Keywords
construction; emergency management; maintenance engineering; project management; disaster; highway; management essentials; project management; tunnel; urgent repair; Companies; Earthquakes; Maintenance engineering; Personnel; Project management; Road transportation; Safety; After Disaster; Highway; Project Management; Urgent Repair;
fLanguage
English
Publisher
ieee
Conference_Titel
Digital Manufacturing and Automation (ICDMA), 2013 Fourth International Conference on
Conference_Location
Qingdao
Type
conf
DOI
10.1109/ICDMA.2013.179
Filename
6598100
Link To Document