Title : 
Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem
         
        
            Author : 
Zhou, Yumiao ; Guo, Qingshun ; Gan, Rongwei
         
        
            Author_Institution : 
Sun-Yatsen Univ., Guangzhou, China
         
        
        
        
        
        
        
            Abstract : 
The resource-constrained project scheduling problem (RCPSP) is a typical combinatorial optimization problem. Base on the general model of ant colony algorithm for solving the RCPSP, this paper presents a new 2opt called PC-2opt which guarantees precedence constraints between activities. PC-2opt, which needn´t to calculate the location of successors, could be directly used to solve the RCPSP, and improve the time efficiency. Proved by experiments, the local search mechanism presented is feasible, effective and better than other similar algorithms to some extent.
         
        
            Keywords : 
combinatorial mathematics; optimisation; scheduling; PC-2opt; ant colony algorithm; resource-constrained project scheduling problem; Ant colony optimization; Artificial intelligence; Benchmark testing; Computational intelligence; Dynamic programming; Gallium nitride; Heuristic algorithms; Large-scale systems; Processor scheduling; Scheduling algorithm; ACO; PC-2opt; RCPSP;
         
        
        
        
            Conference_Titel : 
Artificial Intelligence and Computational Intelligence, 2009. AICI '09. International Conference on
         
        
            Conference_Location : 
Shanghai
         
        
            Print_ISBN : 
978-1-4244-3835-8
         
        
            Electronic_ISBN : 
978-0-7695-3816-7
         
        
        
            DOI : 
10.1109/AICI.2009.461