DocumentCode
3033325
Title
Construction schedule simulation for improved project planning: Activity criticality index assessment
Author
Pei Tang ; Mukherjee, Arjun ; Onder, Nilufer
Author_Institution
Jois Constr. Manage. Syst., Inc., Mercerville, NJ, USA
fYear
2013
fDate
8-11 Dec. 2013
Firstpage
3237
Lastpage
3248
Abstract
The objective of this paper is to illustrate the application of construction schedule simulation during the planning phase of a construction project. Schedule simulations can be used to develop risk informed schedules that support improved contingency planning. This paper discusses the challenges underlying construction schedule simulation, and how they can be addressed by an interactive simulation platform such as the Interactive Construction Decision-Making Aid (ICDMA). Further, the paper uses ICDMA during the planning process, for a case study, to identify the activities in a project that are most likely to change criticality during the construction process. Current scheduling techniques such as the Critical Path Method (CPM) are capable of identifying critical activities, but they cannot be used to assess the likelihood of alternative critical paths emerging during construction due to unexpected disruptions in the as-planned schedule. The research illustrates the usefulness of construction simulation in supporting the scheduling process.
Keywords
construction industry; digital simulation; interactive systems; planning; project management; scheduling; CPM; ICDMA; Interactive Construction Decision-Making Aid; activity criticality index assessment; construction project planning phase; construction schedule simulation; contingency planning; critical path method; interactive simulation platform; Decision making; Indexes; Load modeling; Meteorology; Schedules; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), 2013 Winter
Conference_Location
Washington, DC
Print_ISBN
978-1-4799-2077-8
Type
conf
DOI
10.1109/WSC.2013.6721689
Filename
6721689