Title :
Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies
Author :
Bautista, Joaquín ; Suárez, Raúl
Author_Institution :
Tech. Univ. of Catalonia (UPC), Barcelona, Spain
Abstract :
This paper reviews the formulation of the mixed model sequencing problem with workload minimization (MMSP-W). Two significative models already presented in the literature are describe, showing that they are valid for the case of parallel workstations, but do not properly solve the case of serial workstations. After that, a new model is introduced that is valid for the case of serial workstations. An example is used to illustrate the performance of all the models, and a computational experience was done to verify the applicability of the proposed model using the solver CPLEX and a set of problem instances of small dimension adapted from the literature.
Keywords :
flow production systems; minimisation; workstations; mixed model sequencing problem; overload minimization; parallel workstations; serial workstations; workload minimization; workstation dependencies; Computational modeling; Manufacturing processes; Measurement units; Particle measurements; Production facilities; Pulp manufacturing; Robotic assembly; Robots; Virtual manufacturing; Workstations;
Conference_Titel :
Assembly and Manufacturing, 2009. ISAM 2009. IEEE International Symposium on
Conference_Location :
Suwon
Print_ISBN :
978-1-4244-4627-8
Electronic_ISBN :
978-1-4244-4628-5
DOI :
10.1109/ISAM.2009.5376945