DocumentCode
3035603
Title
The Space of EDF Feasible Deadlines
Author
Bini, Enrico ; Buttazzo, Giorgio
Author_Institution
Scuola Superiore Sant´´Anna, Pisa
fYear
2007
fDate
4-6 July 2007
Firstpage
19
Lastpage
28
Abstract
It is well known that the performance of computer controlled systems is heavily affected by delays and jitter occurring in the control loops, which are mainly caused by the interference introduced by other concurrent activities. A common approach adopted to reduce delay and jitter in periodic task systems is to decrease relative deadlines as much as possible, but without jeopardising the schedulability of the task set. In this paper, we formally characterise the region of admissible deadlines so that the system designer can appropriately select the desired values to maximise a given performance index defined over the task set. Finally we also provide a sufficient region of feasible deadlines which is proved to be convex.
Keywords
control engineering computing; delays; jitter; EDF feasible deadlines; computer control systems; delays; jitter; Algorithm design and analysis; Control systems; Delay; Interference; Jitter; Performance analysis; Process control; Sampling methods; Scheduling algorithm; Sensitivity analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
Real-Time Systems, 2007. ECRTS '07. 19th Euromicro Conference on
Conference_Location
Pisa
ISSN
1068-3070
Print_ISBN
0-7695-2914-3
Type
conf
DOI
10.1109/ECRTS.2007.35
Filename
4271677
Link To Document