DocumentCode
3043742
Title
Grid workflow scheduling based on time prediction of queuing theory
Author
Tian, Guozhong ; Xiao, Chuangbai ; Xu, Xiao ; Gao, Chaoqin ; Nuslati ; Mardan
Author_Institution
Coll. of Comput. Sci. & Technol., Beijing Univ. of Technol., Beijing, China
fYear
2010
fDate
20-23 June 2010
Firstpage
2036
Lastpage
2039
Abstract
For the grid workflow of DAG with strict time limits, this paper puts forward a new algorithm based on the time prediction model of queuing theory. According to the requirements of workflow execution time submitted by users, this algorithm finds critical path first and then obtains the probability of actual execution time exceeding the limit time which was set by users using Little´s law, and then selects the best candidate resources to execute the workflow task. The simulation results show the effectiveness of the algorithm.
Keywords
directed graphs; grid computing; queueing theory; DAG; Little law; directed acyclic graph; grid workflow scheduling; queueing theory; time prediction model; workflow execution time; Automation; Chaos; Computational modeling; Computer science; Costs; Educational institutions; Predictive models; Processor scheduling; Queueing analysis; Scheduling algorithm; DAG; queuing theory; workflow task;
fLanguage
English
Publisher
ieee
Conference_Titel
Information and Automation (ICIA), 2010 IEEE International Conference on
Conference_Location
Harbin
Print_ISBN
978-1-4244-5701-4
Type
conf
DOI
10.1109/ICINFA.2010.5512040
Filename
5512040
Link To Document