DocumentCode
3043949
Title
Assembly line balancing with work zone and station load time windows constraints
Author
Pastor, Rafael ; Corominas, Albert
Author_Institution
Univ. Politecnica de Catalunya, Barcelona, Spain
fYear
1999
fDate
1999
Firstpage
448
Lastpage
453
Abstract
This paper presents the solution of a real problem concerning assembly line balancing with several types of incompatibility, and with the constraint that, for a given number of stations, the load of the stations must be located within a time window that is predetermined according to the average load time. The problem is solved by a two-phase heuristic solution procedure: a truncated dynamic programming procedure and an improvement phase, which involves local optimization and tabu search procedures
Keywords
assembling; dynamic programming; production control; search problems; assembly line balancing; dynamic programming; heuristics; optimization; production control; station load; tabu search; time windows constraints; work zone; Assembly systems; Dynamic programming; Industrial control; Manufacturing industries; Motorcycles; Production systems; Safety; Time factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Assembly and Task Planning, 1999. (ISATP '99) Proceedings of the 1999 IEEE International Symposium on
Conference_Location
Porto
Print_ISBN
0-7803-5704-3
Type
conf
DOI
10.1109/ISATP.1999.782999
Filename
782999
Link To Document