Title
Some properties of discrete lot sizing and scheduling problem with setup times using integral demand
Author
Park, Youngjoon ; Kim, Sheung-Kown
Author_Institution
Korea Univ., Seoul, South Korea
Volume
2
fYear
2000
fDate
2000
Firstpage
859
Abstract
Discrete lot sizing and scheduling problem (DLSP) is the problem of determining a minimal cost production schedule such that dynamic demand is fulfilled without backlogging in a single stage manufacturing process. The problem requires solution of the sequencing and sizing of production lots for a number of different items over a discrete and finite planning horizon. Especially, when we consider setup times in the model, the problem is known to be NP-hard. We developed a formulation different from the conventional DLSP, in that setup costs are charged only when production begins with a new production lot of different items, while the general DLSP charges the setup costs whenever a new production lot begins. We assumed that the demand could be met by the integral quantity with DLSP instead of binary quantity. To support our arguments several propositions are introduced
Keywords
computational complexity; manufacturing industries; optimisation; planning; production control; scheduling; NP-hard problem; discrete lot sizing properties; discrete planning horizon; dynamic demand; finite planning horizon; integral demand; minimal cost production schedule; production lots sequencing; production lots sizing; scheduling problem; setup costs; setup times; single stage manufacturing process; Costs; Dynamic programming; Dynamic scheduling; Integer linear programming; Job shop scheduling; Lagrangian functions; Lot sizing; Manufacturing processes; Parallel machines; Production planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Management of Innovation and Technology, 2000. ICMIT 2000. Proceedings of the 2000 IEEE International Conference on
Print_ISBN
0-7803-6652-2
Type
conf
DOI
10.1109/ICMIT.2000.916818
Filename
916818
Link To Document