DocumentCode
3046812
Title
Study on the status of subgrade engineering in permafrost region during the early operation of the Qinghai-Tibet railway
Author
Shi, Gangqiang ; Li, Yongqiang
Author_Institution
Sch. of Civil Eng. & Mech., Lanzhou Univ., Lanzhou, China
fYear
2011
fDate
26-28 July 2011
Firstpage
4137
Lastpage
4139
Abstract
The Golmud-Lhasa section of the Qinghai-Tibet railway (QTR) is 1,142 Km long, of which 550 Km is in permafrost region. Studies on the status of subgrade engineering in permafrost region are complicated by the intervention of temperature and water and railway operating conditions. Based on in-site investigation and monitoring during the early operation of the QTR, we studied the status of subgrade engineering from three aspects, subgrade deformation, geothermal changes and hydrothermal conditions, and proposed solutions to subgrade cracks to ensure railway safety and conservation.
Keywords
cracks; railway engineering; railway safety; Qinghai-Tibet railway; geothermal changes; hydrothermal conditions; permafrost region; railway conservation; railway safety; subgrade cracks; subgrade deformation; subgrade engineering; Floods; Foot; Rail transportation; Soil; Temperature measurement; Thermal engineering; Thermal stability; operation; permafrost; subgrade engineering styling; the Qinghai-Tibet railway;
fLanguage
English
Publisher
ieee
Conference_Titel
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location
Hangzhou
Print_ISBN
978-1-61284-771-9
Type
conf
DOI
10.1109/ICMT.2011.6002912
Filename
6002912
Link To Document