    Study on the status of subgrade engineering in permafrost region during the early operation of the Qinghai-Tibet railway

  • Author

    Shi, Gangqiang ; Li, Yongqiang

  • Author_Institution
    Sch. of Civil Eng. & Mech., Lanzhou Univ., Lanzhou, China
  • fYear
    2011
  • fDate
    26-28 July 2011
  • Firstpage
    4137
  • Lastpage
    4139
  • Abstract
    The Golmud-Lhasa section of the Qinghai-Tibet railway (QTR) is 1,142 Km long, of which 550 Km is in permafrost region. Studies on the status of subgrade engineering in permafrost region are complicated by the intervention of temperature and water and railway operating conditions. Based on in-site investigation and monitoring during the early operation of the QTR, we studied the status of subgrade engineering from three aspects, subgrade deformation, geothermal changes and hydrothermal conditions, and proposed solutions to subgrade cracks to ensure railway safety and conservation.
  • Keywords
    cracks; railway engineering; railway safety; Qinghai-Tibet railway; geothermal changes; hydrothermal conditions; permafrost region; railway conservation; railway safety; subgrade cracks; subgrade deformation; subgrade engineering; Floods; Foot; Rail transportation; Soil; Temperature measurement; Thermal engineering; Thermal stability; operation; permafrost; subgrade engineering styling; the Qinghai-Tibet railway;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Multimedia Technology (ICMT), 2011 International Conference on
  • Conference_Location
    Hangzhou
  • Print_ISBN
    978-1-61284-771-9
  • Type

    conf

  • DOI
    10.1109/ICMT.2011.6002912
  • Filename
    6002912