Title :
Construction of the geological disaster real-time monitoring demonstration station in Wushan County
Author :
Hongde Wang ; Youlong Gao ; Qilang Le
Author_Institution :
Center for Hydrogeology & Environ. Geol., China Geol. Survey, Baoding, China
Abstract :
Real-time monitoring can achieve of automatic continuous monitoring data collection, and the first time in the information will reach the decision-making for analysis, so as to avoid times squandered which cause serious bad consequences. Therefore that have been regarded by more and more people and become the inevitable trend of monitoring of the geological disaster. The research results are systematically summed up of the Research and Demonstration about Technology & Method on Geologic Hazard Monitoring and Prewarning of the Ministry of Land and Resources P.R.C, introduce the building process of the system of the demonstration, which would provide reference of similar system building.
Keywords :
data analysis; decision making; disasters; geophysical techniques; hazards; China; Ministry of Land and Resources PRC; Wushan County; automatic continuous monitoring data collection; data analysis; decision making; geologic hazard monitoring; geologic hazard prewarning; geological disaster real-time monitoring demonstration station; Geology; Ground penetrating radar; Hazards; Instruments; Monitoring; Real time systems; Terrain factors; data collection; demonstration in Wushan; real-time monitoring; remote data transmission;
Conference_Titel :
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location :
Hangzhou
Print_ISBN :
978-1-61284-771-9
DOI :
10.1109/ICMT.2011.6003173