DocumentCode
3053625
Title
The experience summary and security risk monitor implement of deep foundation pit in metro half-blanket system
Author
Gao, Ailin ; Cai, Jun ; Zan, Haizhu
Author_Institution
Testing Dept., Beijing Urban Constr. Exploration & Surveying Design Res. Inst. Co., Ltd., Beijing, China
fYear
2011
fDate
26-28 July 2011
Firstpage
4693
Lastpage
4697
Abstract
According to engineering implementation of using half-blanket system metro station construction in Beijing Metro Line 9, the third party monitoring scheme and risk management and control condition were introduced in this paper, a preliminary summarization had been made on monitoring experience and risk characteristics of this construction method, and puts forward suggestion of further perfect monitoring system.
Keywords
condition monitoring; foundations; geotechnical engineering; rapid transit systems; risk analysis; security; structural engineering; Beijing Metro Line 9; deep foundation pit; half blanket system; metro station construction; risk control; risk management; risk monitoring; security; third party monitoring scheme; Contracts; Monitoring; Rails; Risk management; Roads; Security; Testing; blanket system; deep foundation pit; monitoring scheme; risk management and control; summary of deformation law;
fLanguage
English
Publisher
ieee
Conference_Titel
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location
Hangzhou
Print_ISBN
978-1-61284-771-9
Type
conf
DOI
10.1109/ICMT.2011.6003243
Filename
6003243
Link To Document