Replacing SIS on live processes plant
Author
Timms, Clive
Author_Institution
MIET, U.K.
fYear
2009
fDate
26-28 Oct. 2009
Firstpage
1
Lastpage
7
Abstract
The increasing demand for oil and gas before the recession was driving up prices and the focus of oil and gas producers was to maintain, and maximise, production from every available facility. We saw more and more safety instrumented system SIS replacement projects for systems such as emergency shut down (ESD) process shut down (PSD) and Fire and Gas (F&G) systems being undertaken whilst the process was still fully operational, in order to avoid loss of production, even though this potentially compromised the integrity of a facility.
Keywords
SIF; SIS; live; process; replacement;
fLanguage
English
Publisher
iet
Conference_Titel
Systems Safety 2009. Incorporating the SaRS Annual Conference, 4th IET International Conference on
Conference_Location
London, UK
Type
conf
DOI
10.1049/cp.2009.1563
Filename
5513066
Link To Document