    Replacing SIS on live processes plant

  • Author

    Timms, Clive

  • Author_Institution
    MIET, U.K.
  • fYear
    2009
  • fDate
    26-28 Oct. 2009
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    The increasing demand for oil and gas before the recession was driving up prices and the focus of oil and gas producers was to maintain, and maximise, production from every available facility. We saw more and more safety instrumented system SIS replacement projects for systems such as emergency shut down (ESD) process shut down (PSD) and Fire and Gas (F&G) systems being undertaken whilst the process was still fully operational, in order to avoid loss of production, even though this potentially compromised the integrity of a facility.
  • Keywords
    SIF; SIS; live; process; replacement;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Systems Safety 2009. Incorporating the SaRS Annual Conference, 4th IET International Conference on
  • Conference_Location
    London, UK
  • Type

    conf

  • DOI
    10.1049/cp.2009.1563
  • Filename
    5513066