• DocumentCode
    3055843
  • Title

    Surcharse precompression processing technique of the C Port cargo area for the low infiltration & deep thick silty

  • Author

    Zhang, Yonghong ; Sun, Yaodong ; Li, Xinhua

  • Author_Institution
    Dept. of Civil Eng., Huaihai Inst. of Technol., Lianyungang, China
  • fYear
    2011
  • fDate
    26-28 July 2011
  • Firstpage
    4653
  • Lastpage
    4656
  • Abstract
    Lianyungang Jingangwan international logistics park is constructed in the coastal soft soil, the freight traffic loads is large, high demands is must to the Port cargo area. For consultation in the soft soil in the economy of Port cargo area works, "Plastic drainage board and preloading" are used to processing the soft soil of the C Port cargo area, combined with the researches, Proved this method is reasonable and effective. We not only guaranteed the quantity of the reconstruction project, and the cost is lower that the budget. In this article we will share our experiences and techniques.
  • Keywords
    geotechnical engineering; logistics; soil; Lianyungang Jingangwan international logistics park; coastal soft soil; freight traffic; infiltration; plastic drainage board; port cargo area; preloading; reconstruction project; surcharse precompression; Civil engineering; Floods; Logistics; Monitoring; Plastics; Soil; Telecommunication traffic; plastic draining water board; soft soil of Port cargo area; surcharse precompression;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Multimedia Technology (ICMT), 2011 International Conference on
  • Conference_Location
    Hangzhou
  • Print_ISBN
    978-1-61284-771-9
  • Type

    conf

  • DOI
    10.1109/ICMT.2011.6003346
  • Filename
    6003346