DocumentCode :
3056463
Title :
Short term production scheduling of an automated manufacturing facility
Author :
Gershwin, S.B. ; Akella, R. ; Yong Choong
Author_Institution :
Massachusetts Institute of Technology, Cambridge, Massachusetts
fYear :
1984
fDate :
12-14 Dec. 1984
Firstpage :
230
Lastpage :
235
Abstract :
We describe extensions to the on-line hierarchical scheduling scheme for flexible manufacturing systems of Kimemia and Gershwin. Major improvements to all levels of the algorithm are reported, including algorithm simplification, substantial reductions of off-line and on-line computation time, and improvement of performance. Simulation results based on a detailed model of an IBM printed circuit card assembly facility are summarized.
Keywords :
Assembly; Job shop scheduling; Laboratories; Manufacturing automation; Production facilities;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Decision and Control, 1984. The 23rd IEEE Conference on
Conference_Location :
Las Vegas, Nevada, USA
Type :
conf
DOI :
10.1109/CDC.1984.272324
Filename :
4047864
Link To Document :
بازگشت