• DocumentCode
    306466
  • Title

    Minimizing the expected variation of waiting times in stochastic flow shop

  • Author

    Jia, Chunfu ; Tu, Fengsheng

  • Author_Institution
    Dept. of Comput. & Syst. Sci., Nankai Univ., Tianjin, China
  • Volume
    2
  • fYear
    1996
  • fDate
    14-17 Oct 1996
  • Firstpage
    1536
  • Abstract
    We consider the problem of scheduling n jobs on a 2-machine flow shop. Under the assumption that the processing times of a job on different machines are identically distributed random variables, several properties of optimal sequences for minimizing the expected variation of waiting times on each machine are established when jobs can be stochastically ordered. We also show that, if the machines are subject to stochastic breakdowns, under appropriate conditions, the properties also hold
  • Keywords
    operations research; optimisation; production control; reliability theory; stochastic processes; distributed random variables; job scheduling; optimal sequences; production control; stochastic breakdowns; stochastic flow shop; two machine flow shop; waiting time variation; Electric breakdown; Filling; Job shop scheduling; Processor scheduling; Random variables; Single machine scheduling; Stochastic processes; Stochastic systems; Time measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1996., IEEE International Conference on
  • Conference_Location
    Beijing
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-3280-6
  • Type

    conf

  • DOI
    10.1109/ICSMC.1996.571375
  • Filename
    571375