DocumentCode
3065905
Title
A Multi-agent System for the Flexible Resource Constrained Project Scheduling
Author
Liu, Jingjing ; Wu, Bing
Author_Institution
Wuhan Polytech. Univ., Wuhan
Volume
2
fYear
2007
fDate
26-28 Nov. 2007
Firstpage
321
Lastpage
324
Abstract
The resource constrained project scheduling problem (RCPSP) is extended to flexible resource constrained project scheduling problem (FRCPSP) in this paper. Resources are assumed to have certain capabilities demanded by project activities, but not necessarily all of them. Resource capability matrix (RCM) is proposed to represent flexible resources. A multi-agent system composed of resource agent, activity agent, and service agent is put forward as an information infrastructure to support flexible resource constrained project management in a highly distributed environment. The definitions of component agents and the strategies of flexible resource allocation are discussed.
Keywords
multi-agent systems; scheduling; flexible resource constrained project scheduling problem; multiagent system; resource capability matrix; Civil engineering; Costs; Investments; Mathematical programming; Multiagent systems; Processor scheduling; Project management; Resource management; System performance; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Information Hiding and Multimedia Signal Processing, 2007. IIHMSP 2007. Third International Conference on
Conference_Location
Kaohsiung
Print_ISBN
978-0-7695-2994-1
Type
conf
DOI
10.1109/IIH-MSP.2007.33
Filename
4457715
Link To Document