• DocumentCode
    3065905
  • Title

    A Multi-agent System for the Flexible Resource Constrained Project Scheduling

  • Author

    Liu, Jingjing ; Wu, Bing

  • Author_Institution
    Wuhan Polytech. Univ., Wuhan
  • Volume
    2
  • fYear
    2007
  • fDate
    26-28 Nov. 2007
  • Firstpage
    321
  • Lastpage
    324
  • Abstract
    The resource constrained project scheduling problem (RCPSP) is extended to flexible resource constrained project scheduling problem (FRCPSP) in this paper. Resources are assumed to have certain capabilities demanded by project activities, but not necessarily all of them. Resource capability matrix (RCM) is proposed to represent flexible resources. A multi-agent system composed of resource agent, activity agent, and service agent is put forward as an information infrastructure to support flexible resource constrained project management in a highly distributed environment. The definitions of component agents and the strategies of flexible resource allocation are discussed.
  • Keywords
    multi-agent systems; scheduling; flexible resource constrained project scheduling problem; multiagent system; resource capability matrix; Civil engineering; Costs; Investments; Mathematical programming; Multiagent systems; Processor scheduling; Project management; Resource management; System performance; Technology management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Information Hiding and Multimedia Signal Processing, 2007. IIHMSP 2007. Third International Conference on
  • Conference_Location
    Kaohsiung
  • Print_ISBN
    978-0-7695-2994-1
  • Type

    conf

  • DOI
    10.1109/IIH-MSP.2007.33
  • Filename
    4457715