• DocumentCode
    3066807
  • Title

    Justifying upgrade projects in existing mills

  • Author

    Hung, Oliver K. ; Klimach, Ben

  • Author_Institution
    Universal Dynamics Ltd., Vancouver, BC, Canada
  • fYear
    1995
  • fDate
    12-16 June 1995
  • Firstpage
    165
  • Lastpage
    169
  • Abstract
    This paper describes the various potential benefits for upgrading existing paper mill electrical and control systems beyond the usual justifications of manpower savings, production cost savings and directly measurable operating and maintenance cost savings. Using examples from upgrades of power systems, drive systems, and control instrumentation systems, the authors describe the various ways that reliability, product quality, and other sometimes intangible benefits can be expressed in dollar terms that management understands. The examples include upgrading a plant water supply electrical system justified on improved reliability and shutdown avoidance and the justification of instrument/control upgrades based on increased "on-grade" pulp production.<>
  • Keywords
    economics; industrial power systems; maintenance engineering; management; motor drives; paper industry; power system control; process control; project engineering; control instrumentation systems; drive systems; maintenance cost savings; management; manpower savings; paper mill; power systems; product quality; production cost savings; reliability; shutdown avoidance; upgrade projects; water supply electrical system; Control systems; Costs; Electric variables measurement; Instruments; Maintenance; Milling machines; Paper mills; Power system management; Power system reliability; Production systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Pulp and Paper Industry Technical Conference, 1995., Conference Record of 1995 Annual
  • Conference_Location
    Vancouver, BC, Canada
  • Print_ISBN
    0-7803-2418-8
  • Type

    conf

  • DOI
    10.1109/PAPCON.1995.404836
  • Filename
    404836