Title :
Chronological simulation in the evaluation of capacity requirements
Author :
Marcato, A.L.M. ; Mello, J. C O ; Souza, R.C. ; Pereira, J.L.R. ; de Oliveira, E.J.
Author_Institution :
Dept. of Electr. Eng., Fed. Univ., Juiz de Fora, Brazil
Abstract :
This work presents a new methodology for the calculation of the payment of system reward capacity. The remuneration of reward capacity offered by the system is being under discussion, mainly owing to increase the competition in electrical sector, which may cause a negative influence on reliability supply. In this methodology the British model has been adapted in order to accommodate the value of reward capacity of hydro plants. In addition the composite generation-transmission reliability is also considered. Finally, different ways in which both generation and distribution agents can pay or receive for the operative reward capacity are discussed. The main objective is to try to reduce as much as possible the existing variation in these payments in the period of a year.
Keywords :
hydroelectric power stations; power generation reliability; power transmission reliability; risk analysis; British; chronological simulation; electrical sector; hydro plants; power generation reliability; power reliability; risk analysis; Costs; Investments; Maintenance; Marketing and sales; Power system analysis computing; Power system modeling; Power system reliability; Production; Reliability engineering; Risk analysis;
Conference_Titel :
Power Tech Conference Proceedings, 2003 IEEE Bologna
Print_ISBN :
0-7803-7967-5
DOI :
10.1109/PTC.2003.1304695