A total productive maintenance implementation in a manufacturing company operating in insulation sector in Turkey
Author
Baysal, Mehmet Emin ; Sumbul, Mehmet Onur ; Ekicioglu, Erdem
Author_Institution
Ind. Eng. Dept., Selcuk Univ., Konya, Turkey
fYear
2015
fDate
27-29 May 2015
Firstpage
1
Lastpage
7
Abstract
In this study, to calculate Overall Resource Effectiveness (ORE), planned downtime, facility downtime, setup and adjustments, material shortages, manpower absence, operator performance losses are found out after observing 4 expanded polystyrene (EPS) machines for 23 days, in 3 shifts a day. In the light of this data readiness, facility availability, mold changeover efficiency, material availability, manpower availability, performance efficiency, quality rate values are found and ORE values for each machine are calculated. Results showed an undeniable need to implement TPM, and suggestions followed.
Keywords
machine tools; maintenance engineering; polymers; production facilities; quality management; resource allocation; ORE values; TPM; Turkey; data readiness; expanded polystyrene machines; facility availability; facility downtime; insulation sector; manpower absence; manpower availability; manufacturing company; material availability; material shortages; mold changeover efficiency; operator performance losses; overall resource effectiveness; performance efficiency; planned downtime; quality rate values; time 23 day; total productive maintenance implementation; Companies; Insulation; Maintenance engineering; Manufacturing; Productivity; Raw materials; overall equipment effectiveness; overall resource effectiveness; total productive maintenance;
fLanguage
English
Publisher
ieee
Conference_Titel
Modeling, Simulation, and Applied Optimization (ICMSAO), 2015 6th International Conference on
Conference_Location
Istanbul
Type
conf
DOI
10.1109/ICMSAO.2015.7152205
Filename
7152205
Link To Document