• DocumentCode
    3074678
  • Title

    Simulation on the Construction Process of Double-arch Tunnel by ADINA

  • Author

    Peng, Yunfeng ; Tan, Wei

  • Author_Institution
    Coll. of Hydraulic & Environ. Eng., China Three Gorges Univ., Yichang, China
  • Volume
    4
  • fYear
    2010
  • fDate
    4-6 June 2010
  • Firstpage
    60
  • Lastpage
    63
  • Abstract
    As a new tunnel structure form, double-arch tunnel is placed on the research stage at home and abroad. Since the stability of surrounding rock and its strain-stress have close relationship with the lining structure function appearance, the reliabilities of the support´s design parameters as well as the working procedure, the stress and displacement in the surrounding rock during different working stages of the double-arch tunnel and the stress and displacement law of the supporting structure achieved are analyzed in this paper, a reasonable excavation procedure, support procedure and the best support time are put forward on the basis of that. It is significant for the design and construction of the double-arch tunnel in China.
  • Keywords
    construction; reliability; stress-strain relations; structural engineering; supports; tunnels; ADINA; China; construction process; double-arch tunnel; lining structure function; strain-stress; tunnel structure; Analytical models; Circuits; Computational modeling; Educational institutions; Geology; Home computing; Numerical simulation; Reliability engineering; Stability analysis; Stress; FEM; construction process; double-arch tunnel; numerical simulation; traffic engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information and Computing (ICIC), 2010 Third International Conference on
  • Conference_Location
    Wuxi, Jiang Su
  • Print_ISBN
    978-1-4244-7081-5
  • Electronic_ISBN
    978-1-4244-7082-2
  • Type

    conf

  • DOI
    10.1109/ICIC.2010.285
  • Filename
    5514017