Title :
Distributed scheduling based on due dates and buffer prioritization
Author :
Lu, C.-H. ; Kumar, P.R.
Author_Institution :
Dept. of Electr. & Comput. Eng., Illinois Univ., Urbana, IL, USA
Abstract :
The problem of scheduling a semiconductor manufacturing facility is addressed. Several buffer priority and due-date based scheduling policies for nonacyclic flow lines are studied. Not all buffer priority policies are stable, as is shown by a counterexample. However, the first buffer first serve and last buffer first serve policies are stable. Also, the earliest due data and least-slack policies are stable. For systems consisting of several nonacyclic flow lines, several stable buffer priority orderings are exhibited. Some simulation results on the performance of these policies are summarized
Keywords :
production control; scheduling; semiconductor device manufacture; buffer prioritization; due dates; least-slack policies; nonacyclic flow lines; production control; scheduling; semiconductor manufacturing; Buffer storage; Counting circuits; Delay; Job shop scheduling; Manufacturing systems; Processor scheduling;
Conference_Titel :
Decision and Control, 1990., Proceedings of the 29th IEEE Conference on
Conference_Location :
Honolulu, HI
DOI :
10.1109/CDC.1990.203659