Study on heuristics for the permutation flowshop with sequence dependent setup times
Author
Dong, Xingye ; Huang, Houkuan ; Chen, Ping
Author_Institution
Sch. of Comput. & IT, Beijing Jiaotong Univ., Beijing, China
fYear
2009
fDate
10-12 Aug. 2009
Firstpage
417
Lastpage
421
Abstract
It is studied that several constructive heuristics for solving the sequence dependent setup time flowshop problem with the objective of minimizing makespan. Three priority rules imbedded in the heuristics are tested and a tie-breaking strategy is examined. The experimental results on benchmarks show that the priority rules are helpful to improve the performance, especially for the instances in which setup times are averagely smaller than the average processing time. The results also show that the setup times have a large effect on the performance of the heuristics.
Keywords
flow shop scheduling; minimisation; sequences; constructive heuristic; makespan minimization; permutation flowshop scheduling; sequence dependent setup time; tie-breaking strategy; Benchmark testing; Genetic algorithms; Greedy algorithms; Linear programming; Flowshop; Heuristic; Makespan; Scheduling; Sequence dependent setup time;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Reuse & Integration, 2009. IRI '09. IEEE International Conference on
Conference_Location
Las Vegas, NV
Print_ISBN
978-1-4244-4114-3
Electronic_ISBN
978-1-4244-4116-7
Type
conf
DOI
10.1109/IRI.2009.5211589
Filename
5211589
Link To Document