• DocumentCode
    3081710
  • Title

    A method of reducing the attrition rate of 110kV arrester base-plate isolator

  • Author

    Han, Li

  • Author_Institution
    Foshan Power Supply Bureau, Power Transformation Dept. 1, Guangdong Power Grid Ltd., Foshan, China
  • fYear
    2008
  • fDate
    10-13 Dec. 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Some 110 kV arrester base-plate isolator in the 110 kV electric substation dominated by power transformation Dept.1, Foshan power supply bureau, burst frequently in the last years. The most serious one ruptured just working three months. This paper talks about the cause of disruption, the settlement and the effect of crack control.
  • Keywords
    arresters; cracks; mechanical variables control; overvoltage protection; power system protection; substation insulation; Foshan power supply bureau; arrester base-plate isolator; attrition rate reduction; crack control; electric substation; power transformation; voltage 110 kV; Arresters; Assembly; Insulation; Isolators; Porcelain; Power supplies; Stress; Vibrations; Voltage; Wind energy; arrester base-plate isolator; isolator crack control; isolator disruption;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electricity Distribution, 2008. CICED 2008. China International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-1-4244-3373-5
  • Electronic_ISBN
    978-1-4244-3372-8
  • Type

    conf

  • DOI
    10.1109/CICED.2008.5211702
  • Filename
    5211702