Investigation of 2008´ frozen disaster and research on de-icing in Guangdong power grid
Author
Liu, Ping-yuan ; He, Hong-ming ; Pan, Chun-ping
Author_Institution
Guangdong Power Grid Corp. Electr. Power Res. Inst., Guangzhou, China
fYear
2008
fDate
10-13 Dec. 2008
Firstpage
1
Lastpage
5
Abstract
In early 2008 in Guangdong Province in northern Guangdong power grid suffered a serious frozen disaster. The disaster situations of northern Guangdong power grid such as collapse of towers, breakage of lines and damages of transforming equipments are discussed, and the causes and lessons from the frozen disaster damage are summarized. The analysis on the frozen disaster of North Guangdong power grid shows routing selection and improved permission design limit on the new and rebuilding lines should be focused. And effective anti-ice and removing-ice methods should be studied.
Keywords
disasters; poles and towers; power grids; power overhead lines; power transformers; power transmission faults; antiice method; frozen disaster damage; lines breakage; northern Guangdong power grid de-icing; removing-ice method; routing selection; tower collapse; transforming equipment damages; Hazards; Ice; Large-scale systems; Ocean temperature; Poles and towers; Power grids; Power transmission lines; Rain; Snow; Substations; Frozen Disasters; Guangdong power Grid; Icing Areas; Lines Icing;
fLanguage
English
Publisher
ieee
Conference_Titel
Electricity Distribution, 2008. CICED 2008. China International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-1-4244-3373-5
Electronic_ISBN
978-1-4244-3372-8
Type
conf
DOI
10.1109/CICED.2008.5211712
Filename
5211712
Link To Document