DocumentCode
3084313
Title
On batch scheduled multiple mobile robots cluttering a workspace
Author
Oommen, B.J. ; Reichstein, I.
Author_Institution
Carleton University, Ottawa, Canada
Volume
26
fYear
1987
fDate
9-11 Dec. 1987
Firstpage
645
Lastpage
648
Abstract
The problem of operating multiple mobile robots in a common workspace is studied using, batch scheduling of the robot tasks with a view to answering the question: "Are k+1 robots better then k?". Our model which has a time complexity which is doubly exponential gives an affirmative answer in the absence of economic considerations but with a simple economic model gives optimal finite values for the number of robots that can be profitably operated in the workspace. The approximations used are discussed and the results compared with a simulation. Finally, the batch and list scheduled modes of operation will be compared.
Keywords
Algorithm design and analysis; Computational geometry; Computer science; Information geometry; Manipulators; Mobile robots; Navigation; Processor scheduling; Scheduling algorithm; Solid modeling;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control, 1987. 26th IEEE Conference on
Conference_Location
Los Angeles, California, USA
Type
conf
DOI
10.1109/CDC.1987.272446
Filename
4049344
Link To Document