DocumentCode :
3094494
Title :
Control room re-instrumentation: “online”
Author :
Willdridge, J.R.
Author_Institution :
FIIE(Elect), UK
fYear :
1999
fDate :
21-23 Jun 1999
Firstpage :
137
Lastpage :
141
Abstract :
Re-instrumentation of existing process control rooms can be undertaken in a variety of different ways, all of which fall into one of two strategies: off-line approach, e.g., during a plant shutdown; or online approach with process plant fully operational. This paper discusses the pro´s and con´s of both methods before outlining the advantages of online change-over and problems which need to be addressed to ensure a safe and successful change-over, with the minimum disruption to production
Keywords :
process control; commissioning; distributed control systems; online change-over; process control rooms; production systems; project engineering; real time systems; reinstrumentation; safety;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Human Interfaces in Control Rooms, Cockpits and Command Centres, 1999. International Conference on
Conference_Location :
Bath
Print_ISBN :
0-85296-715-2
Type :
conf
DOI :
10.1049/cp:19990176
Filename :
787697
Link To Document :
بازگشت