• DocumentCode
    3095229
  • Title

    The study on the short-term scheduling model and solutions of step power plants

  • Author

    Qin, Yue ; Shijie, Cheng

  • Author_Institution
    Coll. of Electr. & Electron. Eng, Huazhong Univ. of Sci. & Technol., Wuhan, China
  • Volume
    3
  • fYear
    2011
  • fDate
    8-9 Sept. 2011
  • Firstpage
    91
  • Lastpage
    95
  • Abstract
    This paper analyses the problem of short-term scheduling of the step power plants. In the paper, optimized short-term scheduling models which take the water balance, the energy balance, the delay of water (hydraulic network), the physical properties of hydroelectric station and the capacity of reservoir into consideration is proposed. Also, the application scope and the extension method for the proposed models are presented.
  • Keywords
    hydroelectric power stations; power system simulation; energy balance; hydraulic network; hydroelectric station; scheduling models; short-term scheduling model; step power plants; water balance; water delay; Electricity; Hydroelectric power generation; Reservoirs; Rivers; Water; Step power plants; generated energy; released water; the model of short-term scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering and Automation Conference (PEAM), 2011 IEEE
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-9691-4
  • Type

    conf

  • DOI
    10.1109/PEAM.2011.6135022
  • Filename
    6135022