DocumentCode
3095229
Title
The study on the short-term scheduling model and solutions of step power plants
Author
Qin, Yue ; Shijie, Cheng
Author_Institution
Coll. of Electr. & Electron. Eng, Huazhong Univ. of Sci. & Technol., Wuhan, China
Volume
3
fYear
2011
fDate
8-9 Sept. 2011
Firstpage
91
Lastpage
95
Abstract
This paper analyses the problem of short-term scheduling of the step power plants. In the paper, optimized short-term scheduling models which take the water balance, the energy balance, the delay of water (hydraulic network), the physical properties of hydroelectric station and the capacity of reservoir into consideration is proposed. Also, the application scope and the extension method for the proposed models are presented.
Keywords
hydroelectric power stations; power system simulation; energy balance; hydraulic network; hydroelectric station; scheduling models; short-term scheduling model; step power plants; water balance; water delay; Electricity; Hydroelectric power generation; Reservoirs; Rivers; Water; Step power plants; generated energy; released water; the model of short-term scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering and Automation Conference (PEAM), 2011 IEEE
Conference_Location
Wuhan
Print_ISBN
978-1-4244-9691-4
Type
conf
DOI
10.1109/PEAM.2011.6135022
Filename
6135022
Link To Document