DocumentCode
3096680
Title
Interlocking principles
Author
White, Colin
Author_Institution
London Underground Ltd, UK
fYear
2012
fDate
21-24 May 2012
Firstpage
75
Lastpage
88
Abstract
The derivation of the purpose of signalling has been discussed and those for interlocking expanded upon. In turn the interlocking requirements can be broken down to fundamental requirements of trailing, facing and crossing elements, from which any layout, however complex, can be constructed. The releasing conditions for such locking are critical and the particular risk involved in a particular type of application must be given careful consideration.
fLanguage
English
Publisher
iet
Conference_Titel
Railway Signalling and Control Systems (RSCS 2012), IET Professional Development Course on
Conference_Location
London, UK
Print_ISBN
978-1-84919-629-1
Type
conf
DOI
10.1049/ic.2012.0045
Filename
6280835
Link To Document