DocumentCode :
3096980
Title :
WAMS Implementation in China and the Challenges for Bulk Power System Protection
Author :
Yang, Qixun ; Bi, Tianshu ; Wu, Jingtao
Author_Institution :
Beijing Sifang Autom. Co. Ltd., Beijing
fYear :
2007
fDate :
24-28 June 2007
Firstpage :
1
Lastpage :
6
Abstract :
Synchronized phasor measurement technology has been gaining increasingly interests in China due to its wide area time synchronization capability and fast transmission speed. Over 10 years of implementation of wide area measurement system (WAMS) in Chinese power grid have shown its great value in power system dynamic monitoring and potential applications in system modeling and validation, feedback control and system wide protection. This paper reviews the overall implementation of WAMS in China and analyzes the corresponding characteristics of WAMS. Moreover the challenges for bulk power system protection with synchronized phasor measurement technology are presented also.
Keywords :
phase measurement; power grids; power system measurement; power system protection; synchronisation; China; Chinese power grid; WAMS implementation; bulk power system protection; feedback control; power system dynamic monitoring; synchronized phasor measurement technology; wide area measurement system; wide area time synchronization; Area measurement; Gain measurement; Modeling; Monitoring; Power grids; Power system dynamics; Power system protection; Time measurement; Velocity measurement; Wide area measurements; Synchronized Phasor Measurement; power system; wide area measurement system; wide area protection;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2007. IEEE
Conference_Location :
Tampa, FL
ISSN :
1932-5517
Print_ISBN :
1-4244-1296-X
Electronic_ISBN :
1932-5517
Type :
conf
DOI :
10.1109/PES.2007.385835
Filename :
4275601
Link To Document :
بازگشت