DocumentCode :
3098463
Title :
Real-time Supervisory Control and Scheduling for Complex Industrial Process Based on Integrated Modeling
Author :
Feng, Xingmei ; Li, Yanping ; Chen, Liang
Author_Institution :
Coll. of Inf. & Eng., Shenyang Univ., Shenyang
fYear :
2006
fDate :
Nov. 28 2006-Dec. 1 2006
Firstpage :
45
Lastpage :
45
Abstract :
A complex industrial process is described by means of a new model of process/transition Petri nets with mixed-mark, namely time-varied process/transition Petri nets in this paper. In this model, the running marks and remnant time of sub-process are introduced. Based on logic and timed mark variables, it solved effectively many problems of complex industrial process, such as the integrated modeling of sub- process, the coupling between discrete variables and continuous states and joining between process controls and production control. And real-time supervisory control and scheduling of complex industrial process with multi-working places are studied deeply based on this model. Finally, the approaches to solve optimal strategies of real-time supervisory control, the realtime scheduling and process control are proposed.
Keywords :
Petri nets; process control; scheduling; complex industrial process; integrated modeling; optimal strategies; process control; production control; real-time supervisory control; time-varied process-transition Petri nets; Educational institutions; Industrial control; Job shop scheduling; Machining; Optimal scheduling; Petri nets; Process control; Production control; Rhythm; Supervisory control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computational Intelligence for Modelling, Control and Automation, 2006 and International Conference on Intelligent Agents, Web Technologies and Internet Commerce, International Conference on
Conference_Location :
Sydney, NSW
Print_ISBN :
0-7695-2731-0
Type :
conf
DOI :
10.1109/CIMCA.2006.171
Filename :
4052689
Link To Document :
بازگشت