DocumentCode :
3102426
Title :
Current distribution and losses of grouped underground cables
Author :
Novak, Balazs ; Koller, Laszlo
Author_Institution :
Budapest Univ. of Technol. & Econ., Budapest, Hungary
fYear :
2012
fDate :
7-10 May 2012
Firstpage :
1
Lastpage :
1
Abstract :
Summary form only given. To fulfill installation requirements, sometimes, two or more cables have to be connected in parallel in a three-phase power distribution system. The division of the current and power among the adjacent cables is governed by several factors, such as position, phase order, and the grounding method of the metal screen. This study demonstrates this effect and compares three solution methods of grouped single-core underground cables with their screens bonded at both the ends. These three methods are: an analytical one provided by international standards and two 2D finite element approaches. One of the FE methods takes the twists of the wire screens into account.
Keywords :
current distribution; earthing; finite element analysis; losses; power cables; power distribution protection; underground cables; underground distribution systems; 2D finite element approaches; FE methods; current distribution; grouped underground cable losses; installation requirements; international standards; metal screen grounding method; phase order; three-phase power distribution system; Current distribution; Economics; Educational institutions; Grounding; Information technology; Power cables; Power distribution;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exposition (T&D), 2012 IEEE PES
Conference_Location :
Orlando, FL
ISSN :
2160-8555
Print_ISBN :
978-1-4673-1934-8
Electronic_ISBN :
2160-8555
Type :
conf
DOI :
10.1109/TDC.2012.6281482
Filename :
6281482
Link To Document :
بازگشت