DocumentCode :
3105087
Title :
UK solutions being implemented [switchgear maintenance]
Author :
Dakers, B.
Author_Institution :
Rolls-Royce T&D, UK
fYear :
1997
fDate :
35724
Firstpage :
42461
Lastpage :
42464
Abstract :
The age profile of switchgear in the UK, coupled with the drive for increased quality of supply, has given rise to a number of options being considered by electric utility asset managers. The choice of which option depends upon many factors: age and condition of equipment; system configuration; outage constraints; plant life; capital funding; health and safety; and system performance. The author has been involved with a whole range of solutions, overhaul/refurbishment, retrofit and replacement with new equipment. The paper highlights four examples of different solutions being implemented
Keywords :
switchgear; UK; electric utility asset management; overhaul; refurbishment; replacement; retrofit; switchgear maintenance;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Switchgear: Retrofit, Refurb or Replace - The Asset Manager's Dilemma (Digest No: 1997/348), IEE Colloquium on
Conference_Location :
London
Type :
conf
DOI :
10.1049/ic:19971173
Filename :
660325
Link To Document :
بازگشت