Application of energy management systems in JCC
Author
Barus, Dhany ; Turnip, Sahala
Author_Institution
PLN P3B
fYear
2008
fDate
1-4 Sept. 2008
Firstpage
1
Lastpage
5
Abstract
Jawa Bali power system represents nearly 80% total loads of Indonesia. JCC is the master station that control power system in Jawa Bali. Energy management and 500 kV EHV T/L switching are the main tasks to be maintained optimal. For the complexity of the network that consists of hundreds generator units and substations and thousands KMC of transmission line, it needs EMS application tools to help dispatcher to control the system securely and economically. EMS is the application that being embedded to the SCADA systems. LFC and NA is the main parts of EMS that being used in JCC. In this paper, experiences of JCC in using LFC since 1993 is presented and described. The process of database and TM/TS improvement in order to activate NA after 18 years blocked is discussed as well. In advance, experiences of dispatcher in using NA will be shared.
Keywords
SCADA systems; energy management systems; power system control; power transmission lines; substations; EHV T/L switching; Jawa Bali power system; SCADA systems; energy management systems; generator units; network complexity; power system control; substations; transmission line; voltage 500 kV; Control systems; Databases; Energy management; Medical services; Power generation economics; Power system control; Power systems; Power transmission lines; SCADA systems; Substations;
fLanguage
English
Publisher
ieee
Conference_Titel
Universities Power Engineering Conference, 2008. UPEC 2008. 43rd International
Conference_Location
Padova
Print_ISBN
978-1-4244-3294-3
Electronic_ISBN
978-88-89884-09-6
Type
conf
DOI
10.1109/UPEC.2008.4651528
Filename
4651528
Link To Document