DocumentCode :
3106497
Title :
Aspects of power transformer asset management
Author :
Elkinson, K. ; Topjian, G. ; Lawrence, M. ; McGrail, A.J.
Author_Institution :
Doble Eng. Co., Watertown, MA, USA
fYear :
2012
fDate :
7-10 May 2012
Firstpage :
1
Lastpage :
5
Abstract :
Power transformers are high value capital items which require close attention. This paper looks at the control loop aspects involved in managing these assets through off line testing and on line condition monitoring. These approaches must be merged into an overall asset management approach which is consistent both with the needs of the organization and the availability of engineering staff.
Keywords :
asset management; condition monitoring; power transformer testing; control loop aspects; engineering staff; line testing; online condition monitoring; power transformer asset management approach; Asset management; Conferences; Monitoring; Oil insulation; Partial discharges; Power transformer insulation; asset management; condition monitoring; power transformer; testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exposition (T&D), 2012 IEEE PES
Conference_Location :
Orlando, FL
ISSN :
2160-8555
Print_ISBN :
978-1-4673-1934-8
Electronic_ISBN :
2160-8555
Type :
conf
DOI :
10.1109/TDC.2012.6281685
Filename :
6281685
Link To Document :
بازگشت