• DocumentCode
    3114951
  • Title

    Enhanced Oil Recovery (EOR) scheme management

  • Author

    Elzubeir, Elsadig ; Demiral, Birol ; Faye, Ibrahima ; Samir, Brahim

  • Author_Institution
    Geosci. & Pet. Eng. Dept., Univ. Teknol. PETRONAS, Tronoh, Malaysia
  • fYear
    2011
  • fDate
    19-20 Sept. 2011
  • Firstpage
    1
  • Lastpage
    2
  • Abstract
    Expanding industries require more capital than static ones. The petroleum industry is both rapidly growing, and highly technological. EOR processes typically employ a large amount of capital investment and operating expense, while having low incremental production over a long period of time. It´s important that a continuously revised procedure be adhered to for EOR evaluation to ensure that all factors affecting EOR are appropriately identified and managed to support investment decisions, and improve the output of EOR processes. This paper discusses how to tackle the factors that tackling EOR development and production, to help take the right decision, optimize the output, and furnish the basis for a procedure file for the oil industry.
  • Keywords
    hydrocarbon reservoirs; petroleum industry; EOR evaluation; EOR process; EOR scheme management; capital investment; enhanced oil recovery; incremental production; investment decisions; oil industry; operating expense; petroleum industry; Educational institutions; Floods; Materials; Petroleum; Petroleum industry; Production; Reservoirs; Decisions; Management factors; Outputs; Procedure;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    National Postgraduate Conference (NPC), 2011
  • Conference_Location
    Kuala Lumpur
  • Print_ISBN
    978-1-4577-1882-3
  • Type

    conf

  • DOI
    10.1109/NatPC.2011.6136466
  • Filename
    6136466