• DocumentCode
    3119387
  • Title

    Control of unreliable cooperative multi-site production systems

  • Author

    Boccadoro, Mauro ; Martinelli, Francesco ; Valigi, Paolo

  • Author_Institution
    Dipartimento di Ingegneria Elettronica e dell’Informazione, University of Perugia, via Duranti, 93 I-06125 Italy. mauro.boccadoro@diei.unipg.it
  • fYear
    2005
  • fDate
    12-15 Dec. 2005
  • Firstpage
    4664
  • Lastpage
    4669
  • Abstract
    In this paper we consider a two site, cooperative, failure prone production system. The failure/repair process of each site is an independent Markov process. Each site may comply with possible shortage of the other site by sending to it a given quantity of products, with a penalty, modeling for example a transportation cost. General properties of the optimal policy are derived through the Hamilton Jacobi Bellman (HJB) equations, according to which the backlog/inventory space of the system is partitioned in regions, each characterized by a constant production rate. A general numerical procedure, which could be also exploited to face several problems approached through a HJB formulation, is developed and applied to the problem considered in this paper to derive the optimal policy and the corresponding optimal cost. An analysis of the effect of system parameters on the optimal policy as well as a comparison with analytical results known for the single site problem are also included in the paper.
  • Keywords
    Control systems; Cost function; Equations; Fluctuations; Jacobian matrices; Markov processes; Production control; Production facilities; Production systems; Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 2005 and 2005 European Control Conference. CDC-ECC '05. 44th IEEE Conference on
  • Print_ISBN
    0-7803-9567-0
  • Type

    conf

  • DOI
    10.1109/CDC.2005.1582898
  • Filename
    1582898