DocumentCode :
3121117
Title :
Genetic algorithm optimized resource activity critical path method
Author :
Wang, Peng-YI ; Lu, Ming
Author_Institution :
Dept. of Civil & Struct. Eng., Hong Kong Polytech. Univ., China
Volume :
4
fYear :
2002
fDate :
4-5 Nov. 2002
Firstpage :
1978
Abstract :
This paper presents enhanced version of resource-activity critical path method (RACPM) optimized by genetic algorithms (GA-RACPM) for resource-constrained project scheduling. The GA formulation is given and the GA-RACPM has been coded into a computer program, which is then used to solve a benchmark problem in the literature. The results show that GA-RACPM has greatly improved the computing performance and set a new benchmark for the total project time. General guidelines on applying GA-RACPM in practical project scheduling are also given based on the results of testing GA-RACPM in a series of projects.
Keywords :
genetic algorithms; production control; resource allocation; scheduling; CPM scheduling; NP-hard problem; critical path method; genetic algorithms; project scheduling; resource activity critical path method; resource allocation; Algorithm design and analysis; Benchmark testing; Electronic mail; Genetic algorithms; Guidelines; Multitasking; Optimization methods; Processor scheduling; Scheduling algorithm; Structural engineering;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Machine Learning and Cybernetics, 2002. Proceedings. 2002 International Conference on
Print_ISBN :
0-7803-7508-4
Type :
conf
DOI :
10.1109/ICMLC.2002.1175383
Filename :
1175383
Link To Document :
بازگشت