DocumentCode :
3122209
Title :
The Systemic Research on the Enterprise Production Planning with Guarantee Period Based on Wagner-Whitin Algorithm
Author :
Zhang Kun ; Li Zhuang ; Teng Guo Ku
Author_Institution :
Grad. Sch. of Comput. Sci., Maritime Affairs Univ. of Dalian, Dalian, China
fYear :
2009
fDate :
2-4 Dec. 2009
Firstpage :
153
Lastpage :
155
Abstract :
MRP (Material Requirements Planning) is mainly applied in the stock control of dependence requirement i.e. relevant requirement which can decrease the stock level significantly. This paper designs a kind of MRP system that can concerns the production with guarantee period by using Wagner-Whitin Algorithm.
Keywords :
materials requirements planning; stock control; Wagner-Whitin Algorithm; dependence requirement; enterprise production planning; guarantee period; material requirements planning; stock control; Algorithm design and analysis; Computer science; Cost function; Databases; Job production systems; Materials requirements planning; Production planning; Production systems; Software engineering; Technology management; MRP; Production with guarantee period; Wagner-Whitin Algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Software Engineering Research, Management and Applications, 2009. SERA '09. 7th ACIS International Conference on
Conference_Location :
Haikou
Print_ISBN :
978-0-7695-3903-4
Type :
conf
DOI :
10.1109/SERA.2009.38
Filename :
5381778
Link To Document :
بازگشت