DocumentCode :
3124706
Title :
Fuzzy logic as a basic for use case point estimation
Author :
Lee, Jonathan ; Lee, Wen-Tin ; Kuo, Jong-Yih
Author_Institution :
Dept. of Comput. Sci. & Inf. Eng., Nat. Central Univ., Jhongli, Taiwan
fYear :
2011
fDate :
27-30 June 2011
Firstpage :
2702
Lastpage :
2707
Abstract :
Project estimation based on function point or use case point (UCP) methods provide only fixed complexity grades which can not deal with the uncertain and imprecise conditions. This study, therefore, provides a fuzzy size estimation procedure for goal-driven use case model based on UCP using fuzzy theory. We propose a metric to calculate the unadjusted use case points of goal-driven use cases based on the relations between each use cases and goals with the fuzzy membership functions and the fuzzy rules. Furthermore, the technical and environmental factors are considered to calculate the use case points which can be used to estimate the implementation time and effort of the system under development. The proposed approach is illustrated by a benchmark problem domain of a meeting scheduler systems.
Keywords :
fuzzy logic; software cost estimation; UCP method; fixed complexity; function point; fuzzy logic; fuzzy membership function; fuzzy rule; fuzzy size estimation; meeting scheduler system; project estimation; use case point estimation; Complexity theory; Electronic mail; Equations; Estimation; Mathematical model; Registers; Software; function point analysis; fuzzy theory; goal-driven use cases; use case point;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fuzzy Systems (FUZZ), 2011 IEEE International Conference on
Conference_Location :
Taipei
ISSN :
1098-7584
Print_ISBN :
978-1-4244-7315-1
Electronic_ISBN :
1098-7584
Type :
conf
DOI :
10.1109/FUZZY.2011.6007717
Filename :
6007717
Link To Document :
بازگشت