In this paper, a bargaining game model with two-sided outside options is presented to investigate the resolution mechanism of disputes under FIDIC Conditions of Contract, Red Book. Most disputes in construction contacts stem from disaccord in contractual interpretation. When a dispute arises, each party has two options between agreement and arbitration. Under FIDIC, either party has the right of calling in the arbitrators and the arbitral award binds the parties. While the mechanism of the dispute resolution process involves a complicated negotiation process, we focus on the mechanism of dispute resolution on the claim, which the contractor asserts, and propose a model by which we analyze the criteria for the choice between agreement and arbitration in the process.
Keywords :
building; civil engineering; contracts; game theory; FIDIC Conditions of Contract; arbitration; bargaining game model; construction dispute resolution; contractual interpretation; dispute resolution mechanism; negotiation process; two-sided outside options; Added delay; Books; Civil engineering; Contracts; Costs; Educational institutions; Project management; Sliding mode control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man and Cybernetics, 2002 IEEE International Conference on
ISSN :
1062-922X
Print_ISBN :
0-7803-7437-1
Type :
conf
DOI :
10.1109/ICSMC.2002.1175658
Filename :
1175658
Link To Document :
بازگشت