DocumentCode
3126664
Title
Implementing the technical performance measures (TPM) plan in the International Space Station Alpha product team environment
Author
Slater, Carl A.
Author_Institution
Johnson Space Centre, Boeing Defense & Space Group, Houston, TX, USA
fYear
1995
fDate
1995
Firstpage
358
Lastpage
364
Abstract
NASA and Boeing the prime contractor of the International Space Station Alpha (ISSA) program are using an integrated product team (IPTs) structure for the organization of the Space Station Program Office. The ISSA program office is also using technical performance measure (TPM) procedures consistent with MIL-STD-499A. This paper describes: the ISSA TPM plan and its implementation; the adaptation of TPMs to the team concept and empowerment approaches of the AIT and IPT organization philosophy; TPM reporting priority: Program Health Measures that are important at each level, from top level management teams to the individual AITs and IPTs; TPM coverage of reserves and margins; and TPM coverage of parameters which are and are not currently meeting program requirements, limits and goals.
Keywords
aerospace computing; artificial satellites; military standards; project management; Boeing; ISSA TPM plan; ISSA program; International Space Station Alpha; MIL-STD-499A; NASA; Space Station Program Office; integrated product team; program requirements; technical performance measures; top level management; Communication system control; Decision making; Extraterrestrial measurements; International Space Station; NASA; Performance analysis; Process design; Production; Resource management; Space stations;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems Engineering of Computer Based Systems, 1995., Proceedings of the 1995 International Symposium and Workshop on
Conference_Location
Tucson, AZ, USA
Print_ISBN
0-7803-2531-1
Type
conf
DOI
10.1109/ECBS.1995.521876
Filename
521876
Link To Document