• DocumentCode
    3136686
  • Title

    A case study on timed supervisory control on a linear cluster tool using aggregated timed synthesis

  • Author

    Swartjes, Lennart ; Su, Rong ; Rooda, Jacobus E.

  • Author_Institution
    Dept. of Mech. Eng., Eindhoven Univ. of Technol., Eindhoven, Netherlands
  • fYear
    2011
  • fDate
    19-21 Dec. 2011
  • Firstpage
    1189
  • Lastpage
    1194
  • Abstract
    In this paper an approach to distributed timed supervisory based on aggregated synthesis is given. This paper formulates the distributed timed control problem and introduces a method for finding the distributed timed supervisor with the minimal makespan with reference to other supervisors synthesized with aggregated timed synthesis. The method is based on bottleneck optimization used in manufacturing lines. After introduction of the aggregated timed synthesis, the synthesis is applied to a linear cluster tool in order to compare the introduced bottleneck optimization with nonoptimized aggregated time synthesis.
  • Keywords
    control system synthesis; distributed control; linear systems; manufacturing systems; optimisation; aggregated timed synthesis; bottleneck optimization; distributed timed control; distributed timed supervisor; linear cluster tool; timed supervisory control; Automata; Indexes; Manufacturing; Optimization; Supervisory control; Workstations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Automation (ICCA), 2011 9th IEEE International Conference on
  • Conference_Location
    Santiago
  • ISSN
    1948-3449
  • Print_ISBN
    978-1-4577-1475-7
  • Type

    conf

  • DOI
    10.1109/ICCA.2011.6137917
  • Filename
    6137917