DocumentCode :
3142162
Title :
Sustainable energy production in Sumatra power system
Author :
Hakam, Dzikri Firmansyah ; Arif, Luqman ; Fahrudin, Taufiq
Author_Institution :
Planning Dept., Transm. & Load Dispatch Centre of Sumatera (PLN P3B Sumatera), Padang, Indonesia
fYear :
2012
fDate :
3-5 July 2012
Firstpage :
1
Lastpage :
4
Abstract :
Sumatra Power System as second largest system in Indonesia with abundant sustainable energy sources currently has a fuel mix that is still dominated by fossil fuels. To anticipate oil price in global market and to decrease subsidize level, Indonesian government in 2007 has launched 10,000 MW Fast Track Program Phase I to develop Coal Based Power Plant. Reducing greenhouse effect and considering least cost production principle; in 2010 the Government issued Fast Track Program Phase II to construct 10.000 MW sustainable energy power plants predominantly by geothermal energy sources. This paper presents but not limited to Sustainable energy resource capacity and also Sumatra Fuel Mix compared to Energy resources in Sumatra power System.
Keywords :
fossil fuels; power markets; power plants; pricing; sustainable development; Indonesia; Indonesian government; Sumatra power system; abundant sustainable energy sources; fast track program phase I; fast track program phase II; fossil fuels; fuel mix; global market; oil price; sustainable energy power plants; sustainable energy production; sustainable energy resource; Coal; Geothermal energy; Power generation; Power systems; Production; Fast Track Program; Fuel Mix; Geothermal; Greenhouse Effect; Sustainable Energy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering and Renewable Energy (ICPERE), 2012 International Conference on
Conference_Location :
Bali
Print_ISBN :
978-1-4673-2468-7
Electronic_ISBN :
978-1-4673-2469-4
Type :
conf
DOI :
10.1109/ICPERE.2012.6287246
Filename :
6287246
Link To Document :
بازگشت