• DocumentCode
    3142162
  • Title

    Sustainable energy production in Sumatra power system

  • Author

    Hakam, Dzikri Firmansyah ; Arif, Luqman ; Fahrudin, Taufiq

  • Author_Institution
    Planning Dept., Transm. & Load Dispatch Centre of Sumatera (PLN P3B Sumatera), Padang, Indonesia
  • fYear
    2012
  • fDate
    3-5 July 2012
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Sumatra Power System as second largest system in Indonesia with abundant sustainable energy sources currently has a fuel mix that is still dominated by fossil fuels. To anticipate oil price in global market and to decrease subsidize level, Indonesian government in 2007 has launched 10,000 MW Fast Track Program Phase I to develop Coal Based Power Plant. Reducing greenhouse effect and considering least cost production principle; in 2010 the Government issued Fast Track Program Phase II to construct 10.000 MW sustainable energy power plants predominantly by geothermal energy sources. This paper presents but not limited to Sustainable energy resource capacity and also Sumatra Fuel Mix compared to Energy resources in Sumatra power System.
  • Keywords
    fossil fuels; power markets; power plants; pricing; sustainable development; Indonesia; Indonesian government; Sumatra power system; abundant sustainable energy sources; fast track program phase I; fast track program phase II; fossil fuels; fuel mix; global market; oil price; sustainable energy power plants; sustainable energy production; sustainable energy resource; Coal; Geothermal energy; Power generation; Power systems; Production; Fast Track Program; Fuel Mix; Geothermal; Greenhouse Effect; Sustainable Energy;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering and Renewable Energy (ICPERE), 2012 International Conference on
  • Conference_Location
    Bali
  • Print_ISBN
    978-1-4673-2468-7
  • Electronic_ISBN
    978-1-4673-2469-4
  • Type

    conf

  • DOI
    10.1109/ICPERE.2012.6287246
  • Filename
    6287246