• DocumentCode
    3145460
  • Title

    Commissioning status of the KEKB linac

  • Author

    Ogawa, Y.

  • Author_Institution
    Linac Comm. Group, KEK, Ibaraki, Japan
  • Volume
    5
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    2984
  • Abstract
    After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established two linac injection modes for the KEKB ring: an 8-GeV electron beam and a 3.5-GeV positron beam, as well as beam modes for the rings of the synchrotron light sources. All modes are easily switched for almost one minute without any trouble. The linac, beam characteristics have been substantially improved by introducing several fine-tuning procedures, while key features concerning stable operation have been pursued by employing, for instance, energy-feedback loops. We report on the present status of the linac commissioning while especially emphasising the operational characteristics
  • Keywords
    beam handling techniques; booster injectors; electron accelerators; linear accelerators; 3.5 GeV; 8 GeV; KEKB linac; commissioning status; electron beam; energy-feedback loops; fine-tuning procedures; linac injection modes; positron beam; stable operation; synchrotron light sources; Acceleration; Electrons; Klystrons; Light sources; Linear particle accelerator; Optical beams; Particle beams; Positrons; Structural beams; Synchrotrons;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1999. Proceedings of the 1999
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-5573-3
  • Type

    conf

  • DOI
    10.1109/PAC.1999.792120
  • Filename
    792120