DocumentCode :
3146127
Title :
A class of resource-constrained multiple project scheduling model with fuzzy coefficients and its application to working procedure
Author :
Zhang, Zhe ; Xu, Jiuping
Author_Institution :
Sch. of Bus. & Adm., Sichuan Univ., Chengdu
fYear :
2008
fDate :
21-24 Sept. 2008
Firstpage :
716
Lastpage :
721
Abstract :
The aim of this paper is to deal with the resource-constrained multiple project scheduling problems (rc-mPSP) with fuzzy coefficients, which is well known one of NP-hard problems, by a hybrid genetic algorithm with fuzzy logic controller (flc-hGA). The objective in this paper is to minimize total project time in the project. Because traditional optimization techniques canpsilat cope with the rc-mPSP problems with fuzzy coefficients effectively, so we presents a new approach based on the hybrid genetic algorithm (hGA) with fuzzy logic controller (FLC). For rc-mPSP with fuzzy coefficients, the approach was tested on a set of standard problems and compared with other approaches. The computation results validate the effectiveness of the proposed algorithm.
Keywords :
fuzzy control; fuzzy set theory; genetic algorithms; minimisation; project management; scheduling; NP-hard problems; fuzzy coefficients; fuzzy logic controller; hybrid genetic algorithm; optimization techniques; project time minimisation; resource constrained multiple project scheduling problems; Availability; Decision making; Fuzzy control; Fuzzy logic; Genetic algorithms; Laboratories; Mathematical model; Project management; Scheduling; Uncertainty; fuzzy coefficients; genetic algorithm; multiple project scheduling; resource-constrained;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management of Innovation and Technology, 2008. ICMIT 2008. 4th IEEE International Conference on
Conference_Location :
Bangkok
Print_ISBN :
978-1-4244-2329-3
Electronic_ISBN :
978-1-4244-2330-9
Type :
conf
DOI :
10.1109/ICMIT.2008.4654453
Filename :
4654453
Link To Document :
بازگشت