DocumentCode :
3148628
Title :
Design and simulation analysis of the hoist mechanism in the gangue cemented backfilling system in coal tunnel
Author :
Sun Hui ; Xiao Linjing ; Xiao Hongbin
Author_Institution :
Shandong Univ. of Sci. & Technol., Qingdao, China
fYear :
2010
fDate :
23-25 Nov. 2010
Firstpage :
157
Lastpage :
161
Abstract :
The gangue cemented backfilling hoist mechanism in coal tunnel adopts forward-pushing combined linkage structure. The initial size of the hoist mechanism is obtained by the graphing method and the simulation model is established based on the size. Then the dynamics analysis of the hoist mechanism is done to test its interference condition and to analyze the forces exerted on the key parts. The dynamics simulation is applied to do the static analysis of the triangle linkage combined with the finite-element method. Analysis results show that the design of the hoist mechanism is correct and can meet the demand of the gangue filling system in the coal tunnel because there is no interference phenomenon and the force curves have no mutation during the motion process.
Keywords :
coal; graph theory; hoists; tunnels; coal tunnel; dynamics analysis; finite-element method; force curve; forward-pushing combined linkage structure; gangue cemented backfilling hoist mechanism; gangue filling system; graphing method; interference condition; static analysis; triangle linkage; ADAMS; ANSYS; Gangue cemented backfilling; graphing method; hoist mechanism;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advanced Technology of Design and Manufacture (ATDM 2010), International Conference on
Conference_Location :
Beijing
Type :
conf
DOI :
10.1049/cp.2010.1279
Filename :
6138999
Link To Document :
بازگشت